Building and developing multifamily construction is important to you, your residents, and the community. Whole Building projects incorporate energy modeling from the earliest design phases to help maximize energy savings, comfort and cash incentives. Talk with an outreach manager today to see how this holistic approach can help your project reach its full potential.
When you approach your project with the entire building in mind, every design feature becomes an opportunity for greater performance. Energy Trust will work with you throughout the design and construction process to make sure you’re supported and incentivized to set bold targets.
The early design phase is essential to your multifamily project’s success. Get in touch with an outreach manager at the earliest stages to make sure your project can benefit from:
Planning for solar + storage from an early stage is always a bright idea. In addition to energy generation, a smart solar design strategy can help reduce installation costs, ensure your systems are compatible and increase the long-term value of your building.
When it comes to long-term energy savings, choosing the right equipment makes all the difference. We’ll help you navigate all the latest technologies and available options to ensure the chosen equipment works together as a holistic, energy-efficient system, and provide incentives based on your project’s overall energy savings.
To be eligible for Whole Building incentives, your project must:
Early Design Assistance | Up to $6,500 to offset the cost of an early design charrette (an interactive brainstorming session with all the members of your project team):
|
Solar Early Design Add-On | $500 for including a solar trade ally in your early design meeting |
Solar Development Assistance | Up to $2,500 to determine the solar potential of your building |
Battery Storage Development Assistance | Up to $5,000 for a solar battery and storage feasibility study to see how you might pair battery storage with a new or existing solar installation |
Solar-Ready Design | Up to $15,000 to meet Energy Trust’s solar-ready standards if installing solar panels isn't possible during construction |
Technical Assistance | 60% of the cost of relevant studies, up to $40,000 total. Common studies include:
|
Whole Building Modeled Savings (≥5% energy use reduction compared to a standard building) | $0.25 per kWh and $0.80 per therm |
Path to Net Zero Modeled Savings (≥80% reduction) | $0.40 per kWh and $1.20 per therm |
Energy Metering | Up to 50% of the cost, up to $20,000 total |
Tell us about your project and enroll during the earliest stages to access our full suite of incentives and resources.
Hold an early design meeting and complete any technical analysis or studies that help optimize your project’s design. Incentives to help offset the cost of your project are available throughout the process.
From energy modeling to construction document reviews, your outreach manager will work with you every step of the way to make sure your project is on track for incentives.
Your outreach manager will visit the finished site to verify that all planned design features were incorporated. You’ll receive an incentive per therm or kWh of energy savings in your model.
If you’ve installed energy metering equipment that monitors your building’s energy performance you can receive additional incentives.
Tell us a little about your ideas, existing project or any questions you have, and an Energy Trust team member will contact you within 1 – 2 business days.
Not sure what solutions are right for you? Tell us a few things about yourself and we'll get you right to the information you need to start saving money and energy today.